Showing posts with label defect-by-design. Show all posts
Showing posts with label defect-by-design. Show all posts

Saturday, December 1, 2012

The real F-35 LRIP-5 costs

The U.S. Defense Department and Lockheed Martin have reached an agreement for the F-35 low rate initial production contract batch 5 also known as LRIP-5.

This has taken over a year to figure out due to the new requirement for fixed price contracts for the program.

The word is that the contract is somewhere around $4 billion for 32 aircraft. Little-to-no mention is given to an additional over $2B dollars that make up LRIP-5 production costs.

The spend on LRIP-5 F-35s is not around $4B. It is over $6B.

Last year, at the end of December, an undefinitized DOD contract for LRIP-5 F-35 airframes was released. At the time LRIP-5 was projected to be for 30 aircraft, down from 42 aircraft when long-lead contracts started being issued in 2010.

Trends: when the program started many years ago, LRIP-5 was to be 120 aircraft.

The recent announcement (with a released contract expected sometime in December), is hailed as a success. However, according to this must-read analysis from early in 2012 (based on LRIP-5 being 30 aircraft and not the newly revised 32), $4B only gets you some of the roll-away price for the jets.

So, in procurement dollars alone, expect the average cost of a LRIP-5 F-35 to be over $198M each, not counting engineering changes.

Also, TR2 hardware, needed to drive Block 3 software, does not arrive until LRIP-6 aircraft are delivered.

All this is for a troubled aircraft that is still nowhere near go-to war trim.

" ...about $77 million per copy."
-Robert Gates, U.S. Secretary of Defense, Feb. 2008.

Wednesday, November 21, 2012

Faulty F-35s limp to Yuma's Operational Test Community

From a reader in relation to the Yuma fraud:

The funny thing is that all 3 jets hobbled to Yuma, yet were envisioned last month by Amos to arrive together for this ceremony. He even wanted 2 of them to perform a slow landing and a vertical landing, respectively, for the press and Sen McCain. That was vetoed by the test community as they have no test instrumentation with which to telemeter data to ground test stations (which Yuma doesn't have, either). Enough STOVL things still have a limited life on them or can't be trusted without external monitoring, yet "probation" was cleared??? Oh, and the Yuma pilots were not qualified in Mode 4 STOVL operations, either. Details.

Only 1 jet was ready last week, so off it went from Fort Worth with its KC-130 tanker (TX to AZ w/o weapons...tell me about the great range again...) and an F-18 chase plane. The "operational" F-35B still can't squawk an IFF code, thus part of the reason for the F-18 chase. The F-35B encountered clutch heating problems before the halfway point, and was forced to a lower altitude to open up a cooling envelope where the clutch cooling fan could be used. Sounds like the clutch drag problem isn't quite as solved as LM and the USG have told us. Be advised that none of this involved converting to STOVL inflight, it was merely cruising in CTOL-type mode at 20K feet.

The second and third jets were to deliver together today. Alas, one had a flight control problem and had to abort. So one went on its own with its KC-130 and F-18 to Yuma. As it held for the ceremonial arrival, it lost all nav systems. So elegant.

The third one departed hours later after having undergone emergency maintenance (any pressure to perform on a day like today??!!!). And yes, it too had its own KC-130 and F-18 chase. It had yet to arrive and some press releases already stated that 3 jets were on the ramp at Yuma. That's our beloved press, to include the cut and paste aerospace press beholden to their advertisers - as you have pointed out so well, Eric. Can't wait to hear about the state of F-35B #3 when it arrived at Yuma.

Operational...hmmm, I don't think so

Friday, November 16, 2012

Rent-seekers use faith in attempt to take high ground

ASPI opines about home-grown submarine naysayers. They ask a fair question or two. Also, reading what is quoted, I would worry.

Warning signs in the Minister for Rent-Seeking and Platitude speech.

"Like any big project there will be naysayers."

Blame the critic. Not always helpful. For the Minister one has to first see if a "naysayer's" argument is valid. Some are.

Then the leap to the Snowy Mountain project where the Minister refers to some words from that time:

"This Government has faith in its engineers, its people and the future of Australia.”

Faith is no substitute for project management skills and sound leadership. My fear is what I am seeing is an avalanche on Bullshit Mountain.

"Those who say just buy submarines from overseas."

Yeah well, we can get a consistant learning curve and long tribal knowledge for crews and logistics management established. All that and have a lethal defensive weapon.

"Those that lack the faith in what Australian workers and Australian industry can achieve."

Faith is irrelevant. When examining the track record of the Entrenched Defence Bureaucracy, the defective ASC and DMO, one has to depend on what is the goal of all properly planned projects: to perform something that can be realistically accomplished. The evidence of Australia being able to do a big home grown submarine project successfully, just is not there.

On paper, what the Minister outlines sounds great. If only he were working with better clay. The only way for a successful home sub project to happen is if there are massive changes. That is, finding people that can lead, manage and understand the language of engineers as opposed to...rent-seekers.

So the taxpayer just spent hundreds of millions to do a future submarine study, all while the rent-seekers had their foot on the brake underneath the roulette table.

That by any definition is fraud.

Friday, November 9, 2012

Stryker--legacy of lies -- air mobility

Hopefully you enjoyed the low tech presentation on the defective Stryker in relation to survivability.

The whole program was a con-artist dream by former and serving military and industry.

Enjoy this installment which shows you how the Stryker failed all of its critical air mobility requirements.

Chapter 5 - Air Mobility

Part 1

Part 2


Part 3

Thursday, November 8, 2012

DMO humour

Quote by Warren King. APDR November 2012.

We have had some failures as an organisation, but I want to put that into context. DMO has many projects that run for 10 years or more – they are big and complex. I have had some work done – that I can't detailed just yet – benchmarking ourselves against the private sector. The preliminary results are very positive.

Typically, we do not have problems remaining within our budgets this seems to be an ongoing method defence projects experience regular budget blowouts. They do not. Around 98% of our work is on or under budget – and that is a better result than industry itself is able to achieve.

How many years did that M-113 upgrade take?

H/T-SR

Wednesday, November 7, 2012

Try again, but thanks for playing...

Nope:

Defence procurement failures have often been explained away on the basis that they are complex, risky, and difficult to achieve without time and cost slippage. For some projects this is certainly true, the Navy’s Future Submarines and the JSF represent cases where for various political and technical reasons options are limited and risks unavoidable. However it would be wrong to assume that this was the case with all defence procurement; simple rules, common sense, and adequate planning can overcome many of these obstacles.

Many risks were avoidable with the Just So Failed. Just consider the history of the project and Australia's severe mistake in getting involved.

For defence procurement, it’s time to go back to basics.

Welcome to the party pal.

Tuesday, November 6, 2012

Stryker--legacy of lies


Reader Blacktail has provided a wonderful set of YouTube videos made from 2009, about the U.S. Army's faulty Stryker AFV. There are 8 chapters with multiple parts. I have linked the videos from Chapter 2 below which deals with Stryker protection or the lack of it.

I have been aware of Stryker failings for a long time. No other presentation method you may have seen on Stryker failings tops Blacktail's efforts.

I would go so far to say that these are award winning videos based on the information presented. The non-perfect presentation method has a charm all its own with the frack from a high-school band coronet around the 1 minute and 1 second mark of many videos.

I am a believer in the U.S. Army; to a point. What we can see is that in future real wars against non-dirt insurgents, the U.S. Army Stryker Brigade concept is less survivable than a Sherman tank in Operation:GOODWOOD.

This means all those Stryker Brigades are essentially undeployable against a hardcore threat. Please take the time to view all the videos in Chapther 2 below. And don't forget, there are 7 other chapters that tell of the Stryker fraud.

--Chapter 2 (Stryker protection)

Part 1

Part 2

Part 3 (best music award)

Part 4

Part 5

Part 6

Part 7

Part 8

Friday, November 2, 2012

The UK's paper tiger carrier

The negative sounding LOL’s are well deserved when we have something like this:

A typical deployment of one 65,000t vessel outside UK territorial waters would include an embarked air wing of 12 short take-off and vertical landing F-35Bs.

Wars can have a bad way of showing up quickly, in the here and not days from now.

For any deployment.

The Boy Scouts have it right: “Be prepared.”

A 6$,000 ton vessel deploying with 12 faulty, short-ranged strike aircraft that have a horrific cost-per-flying hour.

No on-board tanking or proper fixed-wing AWACs.

And if this kind of “force” was sunk outright, quickly, as an object lesson by an aggressor, what would the UK do?

Not much, because they are now officially, a hollow force.

And, the UK taxpayer is getting taken to the cleaners.

As always, best to make buying decisions when looking at a complete go-to-war product. Every potential F-35 customer / partner won’t have intelligent buying-power knowledge until 2019-2020 at the earliest.

Monday, October 29, 2012

New warships with bigger manning needs means big manning problems

The RAN and senior Defence leadership are in a dreamland if they think the 3 Hobart-class air warfare destroyers and 2 Canberra-class amphibious ships will have enough manpower to run them.

Why? Current known manning performance in today's fleet.

A shortage of technical sailors, blamed on the resources boom, has forced the navy to tie up two frontline warships indefinitely while its remaining 10 frigates lost 459 days in just six months this year due to "unscheduled" repairs and maintenance.

The navy describes the temporary withdrawal from service of the WA-based frigate HMAS Arunta and the Sydney-based HMAS Stuart as "extended readiness" and it blames the mining boom's high wages for cornering the market in highly qualified technicians.

He said the impact of the loss of two frigates would be minimal because three of the ships would be out of service receiving an anti-ship missile upgrade. "We still have a problem with technical sailors and retaining technical sailors," Admiral Griggs said.

"It is going to be a long-term thing to recover from."

And as a long-time observer of Defence issues informed me, the excuse of the resources boom is old. It has existed for at least 10 years.

H/T-SR



Thursday, October 25, 2012

Rent-seeker alert


(Houston tells the board a really big fish story)

A lease/rental of U.S. Virginia-class nuke subs may be goofy. On the flip side of that coin we have a rent-seeking orgnisation that will do anything to sling mud at the idea of buying good, existing, off-the-shelf conventional subs to get a capability up now with a long and steady path of crew tribal knowledge.

And, little mention of fixing the DMO.

Here are two worrying points all in one short paragraph:

Speaking after being appointed to the South Australian government's Defence SA advisory board, Air Chief Marshal Houston said building the 12-boat strong future submarine fleet was critical to sustaining Australia's defence industry.

Good post-retirement work if you can get it.

In 2002, the then Air Vice-Marshall Houston stated that the F-35 would be affordable because there were 3000 jets on the order-book.

No such "order-book" existed.

The federal budget is billions in debt due to a spend-thrift government. No amount of crying about cost being less important than some questionable military spending project will matter because there isn't any money.



Tuesday, October 23, 2012

Cry for help: The Pentagon has no clue how to make the F-35 affordable and sustainable


(from a long time ago)




LOL--


Solicitation Number:
N00019-13-R-0012
Notice Type:
Combined Synopsis/Solicitation
Synopsis:
Added: Oct 19, 2012 11:45 am
The Naval Air Warfare Center Aircraft Division, Patuxent River, MD intends to negotiate on a non-competitive basis with A.T. Kearney Public Sector and Defense Services, LLC., 1300 Wilson Blvd, Ste.1050, Arlington, VA 22209 for Sustainment Business Case Analysis (BCA) and Affordability Program Support, Phase II for the F-35 Joint Program Office (JPO). The period of performance for this contract is estimated to be nine (9) months from date of award.

** Note: This synopsis is an amendment to the previous (N00019-12-R-0084) that was issued on January 23, 2012.

The F-35 Joint Strike Fighter (JSF) Program Office (JSFPO) has completed Phase I of the JSF Sustainment Business Case Analysis (BCA) and Affordability Program, and plans to complete Phase II in the next nine (9) months. Phase I included deep dives of four (4) functional areas, including Supply Chain Management (SCM), Sustaining Engineering, Field Support Operations, and Fleet Management. Phase II will address other high priority areas not included in Phase I and complete the F-35 Sustainment Strategy Analysis. It also includes deep dives of the following additional functional areas: Autonomic Logistics Information Systems (ALIS), Training, Support Equipment, Depot Maintenance, Repair, Overhaul & Upgrade (MRO&U) Planning, Software, and Eglin Contractor Logistics Support (CLS) Maintenance not addressed in Phase I. Provide support to the Phase I implementation in order to provide continuity between BCA recommended changes and development and execution of required changes in people, processes and systems to achieve a new sustainment strategy.

A.T. Kearney has completed the support services for this requirement. It is in the Government's best interest to issue a new contract to A.T. Kearney for a continuation of services.

Responses must be received within 15 days of publication of this notice. Any responses should reference the solicitation number N00019-13-R-0012. The point of contact is Ms. Lisa Ellis, email: lisa.ellis@jsf.mil, or Ms. Emily Bannan, email: Emily.Bannan@jsf.mil

Sunday, October 7, 2012

Dane F-35 problem is everyone's problem

The littlest and biggest Joint Strike Failure participants (or prisoners) have massive trouble with their fighter recapitalisation plan.

It appears faith and ignorance were not enough to carry the theory.

Denmark is finding out what happens when one believes a Ponzi scheme:

“Industry leaders had much higher expectations when we joined the JSF,” Villumsen said. “By 2009, the government was still talking about contracts for Danish firms potentially worth up to $4.5 billion. This hasn’t happened. The contracts that have emerged have been relatively small.

"The government", who, like others, used Lockheed Martin (and U.S. State Department) talking points as a substitute for hard analysis.

Don't pity the foolish. Yet, Denmark is only one of many in the same boat who now realize their mistake.

It would be funny if the behaviour wasn't so stupid. Betting on something that isn't even anywhere close to being a final go-to-war aircraft. Worse, betting on PowerPoint slides...as a defense plan.

The JSF senior faithful will still use Denmark as an example to others: don't be Denmark; who still have not ordered any aircraft. See them? That is what happens when you don't believe in what the U.S. says. The "U.S." when it comes to defense deals, being made up of a bought and paid for group of industry funded politicians.

Today, we do not know what the Danes next fighter aircraft will be. That has not been decided. The JSF memorandum of agreement does not demand a country actually buy jets. Also in a recent Danish requirement, slots for new aircraft have changed from 48 down to 30.

It is hard to expect industry pay-days for the rent-seeking class when Mr. 1763, the biggest alleged buyer of F-35s, the United States Air Force, is in huge trouble.

The fantasy plan everyone hoped for, a big part of it, was that when full rate production kicked in, USAF would buy 110 F-35s per year. That is a lot of industry "potential" for sure.

After figuring out that Operations: USELESS DIRT 1&2 had to be paid for, a serious deskilling of procurement professionals (a problem which existed before the wars), and of course the fallout from the 2004 F-35 weigth reduction event (STOVL weight attack team-SWAT) which fixed terrible design assumptions with more terrible design assumptions, cost and affordability hopes blew out.

In 2006, USAF readjusted their F-35 procurement plan so that when full-rate production did kick in, they were good for 30 less jets a year. 80 was the new full-rate F-35 committment for USAF. To make this work, instead of finishing all their procurement by 2028, they would push it out to 2037. This is, in effect, a cut on orders. That is pulling money for 30 jets per year when full-rate starts. That slows down all kinds of things including motor buys.

USAF gets less jets. Rent-seekers get less money per year.

It gets worse.

In 2008, the plans and programs people in USAF--these are the ones that tell the USAF what money is actually available every year to make ends meet--stated that realistically, when full rate production starts up, USAF can only afford 48 F-35s per year.

Those fantasy per-aircraft prices floated about by the Ponzi-zombies could only work if:

1.There was a working aircraft.
2.Thousands were bought on-schedule.

Without that, what the faithful have is...

...nothing.

Yet, for years, so many in government, defense, industry and media circles ignore the hard fact that the biggest cash cow for the F-35 program isn't good for the huge number of the buys needed for all this not to look like a fraud.

They pinned a large portion of hopes on a USAF procurement system that could not:

1.Buy simple air-refueling tankers until the third try
2.Flunked badly trying to buy replacement rescue helicopters.
3.10 years after a major COIN war started, was unable to field simple turbo-prop strike aircraft.
4.Failed at managing the F-22 initial operating capability by not having proper life-support gear on the jet. This was a known risk from many years ago.
5.Has little skill at fielding new fighter aircraft because, (besides the F-22) has not bought any new fighter aircraft in quantity for years.

There are other examples but that will do.

The F-35 program is composed of several performance assumptions (procurement, management, aircraft design) that are weak, poorly risk-assessed and now even those of the model airplane glue fume affected hobby-shop brigade can see the bleeding wounds.

Most of this was before the global financial crisis hit. Those using the GFC as a justification for weak F-35 buys do not know their history.

While the Danes may have problems with their fighter recapitalisation efforts, they have a good chance of recovery. The USAF on the other hand, the major tool for dishing out His righteous might, will be facing growing emerging threats with too many old aircraft.

It isn't just the Danes who were asleep at the wheel. And, with the Danes deciding that their replacement fighter will be an open process, some of them look like the smart people in the room when discussing the great F-35 dellusion.

Friday, October 5, 2012

Weak news article quotes flawed audit

The cost of a JSF is expected to drop from $127 million to $80 million as the production rate increases.

Not credible.

Only if thousands were made with little to no development problems.

That train has already left.

File under: "copy-paste journalism".

----

Shallow audit held as valuable by some

Defence presses forward with their bad idea

Defence presses forward with their bad idea.

Thursday, October 4, 2012

Shallow audit held as valuable by some

The audits (here and here) of the RAAF fast jet running debacle are weak, shallow, and ignore some significant issues.

Noteworthy too is that the original purpose of the Super Hornet decision was to cover for F-35 delays. Nelson (who was PowerPointed into the con) stated as much. More on that here (including the weak justification for getting rid of the F-111).

The normalization of deviance approach to this issue is not useful.

More on the dangers of a normalization of deviance approach to risks--enhanced by group-think--can be seen here.

Following the F-35 path will cost Australia loss of regional air supremacy. What is interesting in the above mentioned audit is the meme of that will not die; the F-35 as a "fifth-generation fighter".

The audit goes into describing the specs of the F-35 and the Super Hornet but (and this is where the shallowness comes in full-bore) portrays no grasp of why the technical details are important beyond a few simplistic claims.

Here are a few things to consider; what the audit didn't tell the public:

History they don’t want you to know

Boeing official-Super Hornet-handles air-to-air with technology, not speed and acceleration

The Super Hornet Stores Story

More on the dud-jamming gear Defence wants to buy

The audit also labels the Super Hornet as "low observable" when such a claim shows a real weakness of understanding balanced defensive measures taken in the design of the aircraft. Those are some low-observable methods to lower signature but just as important: to establish a better known baseline of exposure risks of the aircraft to different threats so that the on-board defensive jamming system is much more efficient. Great, if one does not want to carry any significant weapons capability. Unlike real stealth aircraft, the Super Hornet carries its weapons (not counting the gun) externally. Not very "low observable".

In short, the audit doesn't do much to help the Australian public who are being taken for a ride of billions in wasteful spending for faulty aircraft that will not be competitive against growing Pacific Rim threats.

Hopeless dreams

Interesting, but as far as any F-35/PacRim hopes and dreams go, unrealistic.

"Although South Korea does not currently participate in the F-35B project, the prospect of flying the STOVL fifth generation fighter from Dokdo (or potentially from Dokdo’s successors) undoubtedly appeals to some South Korean defense planners."

About the only thing the F-35 will qualify as is a fifth-generation failure. By definition of its' Joint Operational Requirement Docuemnt (JORD), created in the 1990s and signed off on at the beginning of the last decade, the F-35 will be obsolete vs. emerging PacRim threats.

Power projection with surface ships, requires real air power solutions.

Norway's gamble

Not especially smart on F-35 program problems, Norway's State Secretary throws one out there for the sheep:

Ingrebrigtsen, however, downplays any concerns. "If you don’t want any problems, you should never buy an air fighter," he said, adding that this is a new project that is breaking barriers — and with that comes a critical eye among skeptics.

Norway, Defence-wide has problems making ends meet. Unit-readiness is a problem across the board.

Yet, they are willing to throw good money after bad in order to play in the greatest Defence Ponzi Scheme of all time.

$11B for 50-some jets.

That could buy and sustain a lot of Gripens; something that actually works and doesn't cost $35,500 per flying hour.

Wednesday, October 3, 2012

11 years after F-35 contract award, DOD issues a cry for help

The F-35 journey up to this point has been a fraud.

“It’s about $37 million for the CTOL aircraft, which is the air force variant.”
- Colonel Dwyer Dennis, U.S. JSF Program Office brief to Australian journalists, 2002-

All the PowerPoint slides; all the marketing hype, all the claims of being "affordable and sustainable."


(grossly misleading excerpt from 2007 Lockheed
Martin briefing to Israel)


All the misleading statements to the U.S. Congress and Foreign Parliaments.

Just a few days ago, the U.S. Department of Defense issued a cry for help.

After all those misleading statements for years, the U.S. Department of Defense office that manages the F-35 program, (known as the F-35 Joint Program Office or "JPO") does not know how to make the F-35 "affordable and sustainable". And, it would appear that the new F-35 JPO boss has little to no confidence in what Lockheed Martin has been telling the DOD all these years:

3. OBJECTIVES
The F-35 JPO has not yet determined the acquisition strategy for F-35 sustainment, including the competitive approach; solicitation, evaluation, and award methodology; contract vehicle; socio-economic considerations; scope or hardware/services; delivery schedule/period of performance; rough order of magnitude/budget; intended number of contract awards; or acquisition timeline. The F-35 JPO intends to use information provided in response to this RFI, in addition to other market research, to refine its acquisition strategy and to evaluate alternatives that will deliver the best value, long-term F-35 sustainment solution. This supports the broader F-35 JPO goals of increased affordability, transparency, predictability, and accountability for sustainment costs and performance.

What have these people been doing with our billions all these years?

Not much.

Friday, September 28, 2012

RAAF F-35 costs being ignored, spun, by leadership

Our old classic Hornets will have to go out to the years beyond 2020 because the Just So Failed is very late.

That is the best-case scenario reported by The Australian.

They report that our 71 old, classic F-18 Hornets cost $170M per year to sustain. That is about $2.39M per aircraft per year. Well, they are old, obsolete and should have been retired by now.

The following is what The Australian didn't report:

So what would each new F-35 cost per year to sustain according to estimates in the U.S.? Using American dollars, each F-35 is expected to cost $35,500 per flying hour. Throwing some numbers around, the cost (USD) to sustain one F-35 for one year could look like this depending on how much it was flown:

180 hours per year = $6.4M
200 hours per year = $7.1M
220 hours per year = $7.8M

An Australian government set of figures for cost per flying hour from last year showed our old classic Hornets as as: $11,770 per flying hour. That is based on a fleet of 71 totalling 13,000 flying hours for a year (183 hours per airframe per year) for $2.15M per airframe per year in sustainment.

The Australian Supers were shown as $23,000 per flying hour. One would hope that would come down as learning curve grows on a new type.

So, the F-35 is not only very expensive to acquire, but very expensive to own and operate. It has significant faults. There is still no finished go-to-war design to evaluate. It won't be able to stand up to emerging Pacific Rim threats.

Yet the government says, “buy”.

With budget troubles of all kinds, the RAAF is expected to live within its mean. I am sure the RAAF/DMO/Defence cabal will find a way to apply an interesting spin to all this.

They always do.