Sunday, October 7, 2012

Dane F-35 problem is everyone's problem

The littlest and biggest Joint Strike Failure participants (or prisoners) have massive trouble with their fighter recapitalisation plan.

It appears faith and ignorance were not enough to carry the theory.

Denmark is finding out what happens when one believes a Ponzi scheme:

“Industry leaders had much higher expectations when we joined the JSF,” Villumsen said. “By 2009, the government was still talking about contracts for Danish firms potentially worth up to $4.5 billion. This hasn’t happened. The contracts that have emerged have been relatively small.

"The government", who, like others, used Lockheed Martin (and U.S. State Department) talking points as a substitute for hard analysis.

Don't pity the foolish. Yet, Denmark is only one of many in the same boat who now realize their mistake.

It would be funny if the behaviour wasn't so stupid. Betting on something that isn't even anywhere close to being a final go-to-war aircraft. Worse, betting on PowerPoint slides...as a defense plan.

The JSF senior faithful will still use Denmark as an example to others: don't be Denmark; who still have not ordered any aircraft. See them? That is what happens when you don't believe in what the U.S. says. The "U.S." when it comes to defense deals, being made up of a bought and paid for group of industry funded politicians.

Today, we do not know what the Danes next fighter aircraft will be. That has not been decided. The JSF memorandum of agreement does not demand a country actually buy jets. Also in a recent Danish requirement, slots for new aircraft have changed from 48 down to 30.

It is hard to expect industry pay-days for the rent-seeking class when Mr. 1763, the biggest alleged buyer of F-35s, the United States Air Force, is in huge trouble.

The fantasy plan everyone hoped for, a big part of it, was that when full rate production kicked in, USAF would buy 110 F-35s per year. That is a lot of industry "potential" for sure.

After figuring out that Operations: USELESS DIRT 1&2 had to be paid for, a serious deskilling of procurement professionals (a problem which existed before the wars), and of course the fallout from the 2004 F-35 weigth reduction event (STOVL weight attack team-SWAT) which fixed terrible design assumptions with more terrible design assumptions, cost and affordability hopes blew out.

In 2006, USAF readjusted their F-35 procurement plan so that when full-rate production did kick in, they were good for 30 less jets a year. 80 was the new full-rate F-35 committment for USAF. To make this work, instead of finishing all their procurement by 2028, they would push it out to 2037. This is, in effect, a cut on orders. That is pulling money for 30 jets per year when full-rate starts. That slows down all kinds of things including motor buys.

USAF gets less jets. Rent-seekers get less money per year.

It gets worse.

In 2008, the plans and programs people in USAF--these are the ones that tell the USAF what money is actually available every year to make ends meet--stated that realistically, when full rate production starts up, USAF can only afford 48 F-35s per year.

Those fantasy per-aircraft prices floated about by the Ponzi-zombies could only work if:

1.There was a working aircraft.
2.Thousands were bought on-schedule.

Without that, what the faithful have is...

...nothing.

Yet, for years, so many in government, defense, industry and media circles ignore the hard fact that the biggest cash cow for the F-35 program isn't good for the huge number of the buys needed for all this not to look like a fraud.

They pinned a large portion of hopes on a USAF procurement system that could not:

1.Buy simple air-refueling tankers until the third try
2.Flunked badly trying to buy replacement rescue helicopters.
3.10 years after a major COIN war started, was unable to field simple turbo-prop strike aircraft.
4.Failed at managing the F-22 initial operating capability by not having proper life-support gear on the jet. This was a known risk from many years ago.
5.Has little skill at fielding new fighter aircraft because, (besides the F-22) has not bought any new fighter aircraft in quantity for years.

There are other examples but that will do.

The F-35 program is composed of several performance assumptions (procurement, management, aircraft design) that are weak, poorly risk-assessed and now even those of the model airplane glue fume affected hobby-shop brigade can see the bleeding wounds.

Most of this was before the global financial crisis hit. Those using the GFC as a justification for weak F-35 buys do not know their history.

While the Danes may have problems with their fighter recapitalisation efforts, they have a good chance of recovery. The USAF on the other hand, the major tool for dishing out His righteous might, will be facing growing emerging threats with too many old aircraft.

It isn't just the Danes who were asleep at the wheel. And, with the Danes deciding that their replacement fighter will be an open process, some of them look like the smart people in the room when discussing the great F-35 dellusion.

Tuesday, August 28, 2012

More discover F-35 Ponzi Scheme

More industry players are waking up and discovering the F-35 Ponzi scheme.

“All we know is that there will be 50 airplane builds this year, and there were supposed to be 118 airplanes built this year,” Smith said. “The ramp-up just hasn’t been there. In terms of future employees, it's probably about 20 people that we won’t need but that we’ve been planning on. Until the business is up, nothing is for sure.”

There will be thousands built. It will be affordable. It is on PowerPoint, it must be true.

Business suffers. Employment suffers. Real people suffer.

Death by over-optimism, faith and listening to charlatans.

(2003 briefing)

I'm shocked that industry would be at risk since we had such top analysis down-under:

The decision to invest was bold and would carry the RAAF into the future, enabling it to dominate Australia's air and sea approaches, he said. The stealth aircraft was affordable because there were already so many, more than 3000, on the order books, said Air Marshal Houston.

--

-SME's face the truth about F-35 industry work (or lack of it)

-F-35 Production Cut Update


Thursday, August 16, 2012

Next LM boss tries some spin on AV Week

The Next LM boss has a few examples of spin with the F-35 program when talking to AV Week.

Here is an interesting one:

Lockheed Martin is on the hook to deliver the JSF low-rate initial production III and IV aircraft by the end of the year. Will you meet that deadline?

It's close. We experienced a 10-week strike in Fort Worth that just ended a month ago, and that could drive some challenges as to whether some aircraft get delivered late this year or early in 2013. We're in dialogue with our customer, and they know the challenges.

For the record, LRIP-3 is already late. The contract was to end in December 2011. Just a few months ago was the start of LRIP-3 deliveries to the customer. LRIP-4 contracts are to be completed by March of 2013. Given the number of aircraft to hand over, not all that far off.



Wednesday, August 1, 2012

Broken promises-more trouble for F-35 supply chain

As some suppliers have trouble or go under, someone has to pick up all the work for those 3000-6000 F-35s that are certain to be made.

Where are all those orders? Investors want to know.

Thursday, July 26, 2012

How Lockheed Martin took over Australia's leadership role for replacement fighter aircraft

Lockheed Martin runs nearly all aspects of decision-making for Australia's fighter replacement program. Oh, there is now some people waking up to the horror and slowing funding because of obvious gross risk, but that is only recently after many years of can-do delusion. And for those that oppose the F-35, it is pretty important to take the wanton rent-seekers in to account.

For years if there were problems with the F-35, talking points were filtered down from LM and became the de facto Australian government position on the matter.

Below is a letter and accompanying paper constructed by then Defence Minister Hill and his merry band back in 2003. Look at the big leap taken for Australia to join the risky F-35 program. All the chips were pushed in on one big bet. The greed of rent-seeking potential was just too strong.

And while there appears to be some words stating if it all doesn't work out, Australia can withdraw...

While the supplement does not guarantee work share, there is an explicit statement included in the supplement that enables Australia to withdraw from the SDD phase if Australian industry expectations are not realised.

Everyone is pretty much all-in. Victory or defeat. No in-between. Further:

Prior to signing the MOU, there was an Exchange of Letters (EoL) between the Australian and US Governments concerning Australia’s aspirations for long-term participation in the JSF program. Unlike the MOU, which only covers the SDD phase, the EoL addresses matters concerning the joint development, production, operation and support of an effective and affordable JSF. These letters affirm the importance of having no predetermined work share for any participating country and of maintaining a level playing field for industrial participation for the life of the program. The Australian Government expects to have visibility into industrial participation to monitor outcomes for Australian industry to assure the Government that subcontracting competitions are conducted fairly and provide best value.

How reassuring. So many years later, how are we doing today? Affordable? Not yet. Lots of industry work? No. Thousands of F-35s for the future? A dream. Notice that most of letter and paper below is industry, industry, industry and little mention if it is a valid weapon's system other than platitude.

As long as it can make an equal number of take-offs and landings most of the time, the grubby rent-seekers are happy.



---

“It’s about $37 million for the CTOL aircraft, which is the air force variant.”
- Colonel Dwyer Dennis, U.S. JSF Program Office brief to Australian journalists, 2002-

". . . US$40 million dollars . . "
-Senate Estimates/Media Air Commodore John Harvey, AM Angus Houston, Mr Mick Roche, USDM, 2003-

" . . US$45 million in 2002 dollars . ."
-JSCFADT/Senate Estimates, Air Commodore John Harvey, Mr Mick Roche, USDM, 2003/2004-

". . average unit recurring flyaway cost of the JSF will be around US$48 million, in 2002 dollars . . "
-Senate Estimates/Press Club Briefing, Air Commodore John Harvey, 2006

". . the JSF Price (for Australia) - US$55 million average for our aircraft . . in 2006 dollars . ."
-Senate Estimates/Media AVM John Harvey ACM Angus Houston, Nov. 2006-

“…DMO is budgeting around A$131 million in 2005 dollars as the unit procurement cost for the JSF. .”
-AVM John Harvey Briefing, Office of the Minister for Defence, May 2007-

“There are 108 different cost figures for the JSF that I am working with and each of them is correct”
-Dr Steve Gumley, CEO of the DMO, Sep./Oct. 2007-

“…I would be surprised if the JSF cost us anymore than A$75 million … in 2008 dollars at an exchange rate of 0.92”
-JSCFADT Dr Steve Gumley, CEO DMO, July 2008-

". . Dr Gumley's evidence on the cost of the JSF was for the average unit recurring flyaway cost for the Australian buy of 100 aircraft . ."
-JSCFADT/Media AVM John Harvey, Aug. 2008-

Confirmed previous advice i.e. A$75 million in 2008 dollars at an exchange rate of 0.92,
-JSCFADT Dr Steve Gumley, CEO of the DMO, Sep. 2009-

" ...about $77 million per copy."
-Robert Gates, U.S. Secretary of Defense, Feb. 2008.


---

Australian Defence answers serious F-35 project concerns with "so what?"

Before there was "So what?" there was "Why worry?"

Thursday, June 14, 2012

Senate told about gross over-optimism in Defence procurement

:::Shock!:::

When purchasing giga-dollar weapons systems, the Entrenched Defence Bureaucracy is guilty of substituting proper analysis with unconfirmed claims by marketeers according to this article.

Misplaced confidence in the claims of defence industry "marketeers" contributed to expensive past blunders on major contracts - some worth billions of dollars - a Senate Committee inquiry into Defence acquisitions was told yesterday.

Also, the DMO boss claim of "old projects" needs definition. Many "old" projects are not even in active service yet and are a disaster waiting to happen. Add to that: our tax dollars pay people working in Defence (some even wearing the uniform) to actively market troubled military programs. Projects like the F-35 program for Australia (somehow missing from the Project of Concern List even though money has been put forward for two test and training aircraft), the Air Warfare Destroyer funnies and certainly the dream to build 12 uber-submarines at home are pushed by marketeers that don't identify proper risks. Maybe that $214M for a sub study will be useful as opposed to a "can-do" attitude for Operation: BARKING MAD.

Service chiefs are of no help either. The RAAF boss is guilty of the same behaviour.

Friday, June 8, 2012

30 years of graft and rent seeking

Operation: Barking Mad continues.

The fleet is being enlarged because of concerns over increases in the naval forces of Australia's Southeast Asian neighbors, in particular China which is in the process of introducing its first aircraft carrier.
Even if no one knows how to keep 6 subs crewed and operational. I would prefer any 5 year plan that put subs in the water over the the white-elephant inspired by the Entrenched Defence Bureaucracy.

Good luck.

Thursday, May 31, 2012

SME's face the truth about F-35 industry work (or lack of it)

Government and big industry told a fairy tale about thousands of F-35s. Yet things just are not working out that way.

Now SME's are waking up from a happy and unrealistic dream.

"But despite the contracts we have in place, the revenue has not covered the investment, at this point in time," he said. "According to how the build schedule was looking five years ago, there should have been up near 100-plus aircraft being manufactured this year, but with all the delays it is down to 32 aircraft."

Another South Australian company that invested $10m to obtain work on the JSF is now also in difficulty because of delays.

And, Production Parts died last year. BTW, LRIP-5 was supposed to be 120 jets.

Monday, May 28, 2012

Confidential government report warns 1,500 SME defence contractors at risk of failure

The dying defence sector SMEs.

This is what happens when you reduce the budget in a specific industry by a large amount."

In part. The other part of that is SMEs were in for a tough go because the Entrenched Defence Bureaucracy told massive fibs to industry about the fantasy of 3000+ F-35s. That: there was up to $9B in home industry work (potential) and every superlative to describe the Just So Failed.

Ask Production Parts how that all worked out. Oh wait. You can't. They are dead.

Corporate carcasses indeed.

Monday, May 7, 2012

Saving $37B on reality

Have a look at one of the men that wants to take your money and waste it on Operation: BARKING MAD.

It is an unfortunate fact that the Australian Entrenched Defence Bureaucracy (EDB) has to live within a realistic budget.

The assumptions that the rent-seekers make about an off-the-shelf sub not being suitable for Australian waters is a non-sense. If the same guy was hawking batteries in Euro-land guess what he would say?

The following is a comparison of savings that can be had in future procurements for fighter aircraft and subs. Realism vs. what the rent-seekers want.

Note that, since air policing is now the only option for Australia for its air power roadmap until budgets and the mental-health of Defence senior leadership improves (I know. Grossly optimistic. That's me.), best to get something one can actually afford; the Gripen. And I am talking about the C/D and not the future one.

Rent-seekers: $36B for subs that might not work; $16B for fighter aircraft that certainly will not work. Total waste: $52B.

Reality: $6B For 6 subs that will work. The dumbassery of the 2009 Defence White Paper with 12 subs was an imaginary number. Good. I will throw one out too: 6. More; but only if it is proven that we can crew and operate 6.

$9B for 72 C/D Gripens and 10 years of flying costs. I even pumped up the cost per flying hour significantly to make up for DMO goof ups. 10 years of flying costs is good enough because that is about as far as one can predict for labor, fuel and anything else.

Total capability: $15B

Savings of Reality vs. The Rent-seekers: $37B, if not more that doesn't have to be wasted on the low-productivity EDB.

Monday, March 26, 2012

Australia's Quickstep is now shipping F-35 parts...there is a problem though

Quickstep has to show its investors that it is doing something. Take for instance this announcement.

Here is the business they should have been doing, (in blue).

That is a lot of lost money.

Interesting as Lockheed Martin's front man Tom Burbage told Parliament the other day that there is $4.5B in home industry potential.

Interesting because that is a cut by half of what the politicians and business leaders where told when Australia signed up for the F-35.

Hopefully Quickstep can alter their business plans.

Saturday, March 10, 2012

Work for the 3rd Air Warfare Destroyer goes back to Spain


In what appears to be a vote of no confidence in home industry to successfully perform work on the third Air Warfare Destroyer, the government is sending a large portion of work back to Spain.

How this will play out is unknown but this will be a blow to future plans for military ship-building at home.

Which is confusing when you see this news item.

Then there is this from yesterday:

Local shipyards snubbed as Defence looks to Spain
BY: CAMERON STEWART From: The Australian

DEFENCE has delivered a stunning vote of no confidence in Australia's naval shipbuilding industry by asking a Spanish company to help build its third air warfare destroyer, in a move that will cost local shipyards hundreds of jobs and at least $40 million in lost revenue.

The controversial decision was made quietly last month, despite protests from local shipyards.

Tuesday, February 28, 2012

No support from Italian maker if U.S. tries to sell C-27s bought for DOD

I agree with this. It is a business. Why should the DOD be allowed to under-cut Italian sales because of poor planning?

Sunday, December 11, 2011

Inconvenient EVM advert

Unfortunate advert to show up next to a pro-LM infomercial.

(click image to make larger)


Why? Because of history.

Wednesday, October 26, 2011

F-35 industry missing out on orders

Governments--in this example; Canada--can spin how great home industry effort is for the F-35 program, yet there is the simple fact that there are a lot of missing orders for the SMEs (those critical jobs that are very fragile under this high risk program).

The subdued red field in the chart below shows what industry was promised is quite a bit different than what is happening. That is a lot of missing orders. Corporate carcasses indeed.

Tuesday, October 18, 2011

F-35, the low price that never was

Is there any justification left to have the F-35? It will not be able to take on emerging threats. Whatever expectations of its alleged combat capability are already being diminished.

All this eliminates the purpose for the F-35.

To add to that misery, it will not be affordable. Even the U.S. DOD thinks so. There will not be enough aircraft made to meet the dreams of the business plan. Current predictions see over 1000 F-35 potential orders missing.

Small businesses are in grave danger.

With that, we have a simple graph composed by Air Power Australia. It shows a history of the low price that never was.

How will SMEs survive?

This is a good read on some of the problems facing Australian home defence industry.

Unfortunately it is not aggressive enough in pointing out the flaws in the Defence bureaucracy. This is a war. Thy enemy has a name.

I believe it was Da Vinci who said,"Many have made a trade of delusions and false miracles, deceiving the stupid multitudes".

If SMEs seeking defence business are to survive, they will have to make their case that they cannot perform work in a hostile environment. This is an era where senior Defence and DMO--those that collect a fat government paycheck--have only one interest. That interest is to continue to collect a fat government paycheck.

I don't see any of this improving until there is sound strategy that has the defence of the country as its main goal. Once Australia decides to participate in that effort, then we move on to simple things.

A simple thing would be to demand that Defence and Defence advisers tell the truth in hearings before our elected officials. When they do not, they get charged and punished.

After that, things like breaking up the DMO should be easy to do. Simply because the DMO is a major roadblock to progress.

I would like to see a university study suggest that in a very strong way.

Until then, the Royal DMO and the Defence bureaucracy can continue to do what they want.

Pointing out that SMEs are in trouble is a good effort. However, what is needed is to name the traitors and wastrels that continue to hurt this country's defence posture so that they can be removed. Every piece of dead wood removed means money can be redirected to things that provide value.

Monday, October 17, 2011

DMO and "The Little Guys"

Maybe someone out there can help me get a grasp on all of this. From page 10 of the report below. A quote from DMO Commercial Manager, Harry Dunstall.

Mr Dunstall: The little guys. There is the big Commonwealth and 'if you want to do deals with the Commonwealth you basically accept our terms and conditions or you do not do business'

(click on image to make it larger)


It seems there are lots of law firms to help out the big guys but I don't know if that ends in doing the right thing. How hard is all this if you are an SME? Is the government being fair to home defence industry?

Apology to home defence industry and, where are we going?

I want to apologize. My comments on home defence industry in yesterday's post were too harsh.

Again, I am usually the optimistic guy on the team; yet for the current Defence situation there really are a lot of problems.

First, how do we keep and bring new engineers to Defence industry? They can find stable and predictable work almost anywhere else.

Like it or not, the current Defence/DMO situation is still hostile to the Defence industry. The Defence bureaucracy has over the years signed a deal with the devil. It has allowed foreign industry to heavily influence too much workshare that would normally be done by Australians. The end goal seems to be that large portions of our industry are to shut-up while Defence/DMO sign up for an off-the-shelf item and we end up doing warehousing and screw-driver turning labelled as "sustainment".

While there could be many inquiries, we need real ones of why Defence Ministers are so poorly advised and why are there so many civilians in Defence?

Also needed: real punishment for lying to elected officials in hearings dealing with Defence issues.

I like off-the-shelf purchases when they make sense. Yet, I don't see much of anything in the current Defence/DMO management trends that make sense.

Consider what we get in return with the following platform decisions.

-There is no direct replacement for the Caribou. Defence is in absolute fear of refurbishment and upgrades of old platforms.
-The F-111 which offered great capability to be upgraded (JDAM, JSOW, JASSM, SDB and a future super-sonic stand-off cruise missile) is now gone. The range capability was a great loss.
-Defence buying a more expensive U.S. made combat system for the Collins-class when a cheaper and better alternative made here in Australia was minimised.
-The F-35 and the Super Hornet can in no way achieve air superiority in the region over the time span of their service. Money spent in this area is all wasted.
-If we need to keep our warship-building industry healthy with stable contracts over time there is plenty to do. That is: move up the Frigate replacement and build other small warships that are more scalable to our defence needs.
-Prove that we can effectively repair what we have. For example the recent amphibious ship maintenance disaster and the Collins class submarine situation.

I do not know where all this will lead. I do know that things are getting worse. We continue to pay more for less... real defensive capability.

What, if anything, will change that negative trend? I do know that keeping our home industry in bondage will not help.

Sunday, October 16, 2011

Defence has no horses to pull the cart

Some in Australian home industry are making outrageous unqualified statements that off-the-shelf equipment is bad. Yet there are some other things to think about with this article from the Canberra Times.

The real problem is the entrenched Defence bureaucracy including the failed experiment known as the DMO.

How can any home industry survive in such a hostile environment? The answer is: it is not.

And, even when Australian home industry does get some important work, there aren't enough skills to manage it and see the project through. For instance, there was a time when the troubled Air Warfare Destroyer project was quoted to come in at $6B. Later it was marketed as an $8B dollar project. Now it is in trouble and will cost more. All the while when we could have had 3 off-the-ships for much less. Oh wait; there is no capability need for such ships. They will consume too much manpower and get sunk in any real shooting war. Kind of like this.

All that, and Australia does not have the skill at home to bring in a much more complex 12 sub project at an unthinkable figure beyond $36B.

Some ignore the fact that the goal of Defence is for defence of the country and not an exercise in burning up taxpayer cash on poorly thought out project management disasters.

The home industry goals of the rent-seekers are beyond unrealistic.

When someone quotes the joke of the 2009 Defence White Paper as if it has worth, then you know they are from an alternate reality; are mentally affected or suffer from recreational substance abuse.

It is time to understand that Australia does not have realistic defence project management skills; has no credible long-range strategic thinking in government; and can only fall back on the tried and true destructive methods of institutional group-think.

Today, trying to decide what weapon system needs to be procured is all cart-before-the-horse until there is real change in the Defence bureaucracy. In addition, that change has to address sound strategic thinking of our defence needs.