Based on what we now know, pulling the procurement management of a CF-18 replacement from the DND was the correct decision.
This article points to some pretty shocking behaviour by the DND.
While pondering what now seems obvious, consider this summary on Thana Marketing and compare it to what you have been told by the cheerleaders when they tell us about F-35 greatness.
Showing posts with label DND. Show all posts
Showing posts with label DND. Show all posts
Thursday, April 12, 2012
Thursday, April 5, 2012
Define "theoretical"
Interesting what some "experts" think:
Let us compare the F-35 to the slowest 4th gen out there; the Block II Super Hornet:
-Sortie rate per-day/per week: Super Hornet
-Deliver with in agreed cost and schedule: Super Hornet
-Affordable in acquisition and sustainment: Super Hornet
-Able to take on non-anti-access threats better-cheaper: Super Hornet
-Better to assist in anti-access threats (note; by virtue of the JORD, the F-35 and this study, the F-35 will not be able to stand up to anti-access threats). Again: Super Hornet.
-Two-aircrew attack option: Super Hornet
-Two-engines: Super Hornet
-Structural survivability: Super Hornet
-Radar threat survivability: Super Hornet
-Better in Within-Visual-Range (WVR) combat (HOBS, working helmet, manoeuvre, etc.): Super Hornet.
-Better value to the joint theater commander (networking, and proven effectiveness): Super Hornet.
-Buddy tanker: Super Hornet.
-Escort jammer option: Super Hornet.(An important distinction for Growler hopefuls; the difference between an escort jammer and a stand-off jammer. Against anti-access threats; and even with the great hope of a next-generation jammer, long range emerging threats will still be out of reach).
-Proven clearance of a wide variety of short and long range precision guided munitions: Super Hornet.
-Affordable within a $9B procurement budget and $7B 20 year maintenance budget? Unknown. If one needs 72 Super Hornets, (a more viable operational need), you might be looking in the $22B region with 300 flying hours per airframe per year. If you go with 65 jets and less annual flying hours, then you might be able to swing the $16B number for 20 years. And, there are actual existing figures to look at with the Super so Canadian decision makers have realistic information in front of them.
There is more to this list. But it is my opinion that the "theoretical" label applies to every F-35 metric. The F-35 does not have the maturity to be properly evaluated. It is possible that it may never reach that milestone.
What is not "theoretical" is how long one can keep CF-18s operationally viable. 2020 is the realistic limit. If a procurement decision is made within the next year, it may be possible for Canada to retire the CF-18 with dignity while maintaining operational capability for home defense and operations abroad.
Boeing Super Hornet flipbook (PDF)
Even if the Conservatives announced a new competition, the F-35 would still come back as the winner, according to Rob Huebert of the University of Calgary’s Centre for Military and Strategic Studies.
“It’ll come back and say there is no other competitor,” he said, disputing Wheeler’s claim that there are alternatives.
Huebert said the “theoretical” alternatives are either outdated like the F/A-18 Super Hornet or just as expensive like the Eurofighter.
Let us compare the F-35 to the slowest 4th gen out there; the Block II Super Hornet:
-Sortie rate per-day/per week: Super Hornet
-Deliver with in agreed cost and schedule: Super Hornet
-Affordable in acquisition and sustainment: Super Hornet
-Able to take on non-anti-access threats better-cheaper: Super Hornet
-Better to assist in anti-access threats (note; by virtue of the JORD, the F-35 and this study, the F-35 will not be able to stand up to anti-access threats). Again: Super Hornet.
-Two-aircrew attack option: Super Hornet
-Two-engines: Super Hornet
-Structural survivability: Super Hornet
-Radar threat survivability: Super Hornet
-Better in Within-Visual-Range (WVR) combat (HOBS, working helmet, manoeuvre, etc.): Super Hornet.
-Better value to the joint theater commander (networking, and proven effectiveness): Super Hornet.
-Buddy tanker: Super Hornet.
-Escort jammer option: Super Hornet.(An important distinction for Growler hopefuls; the difference between an escort jammer and a stand-off jammer. Against anti-access threats; and even with the great hope of a next-generation jammer, long range emerging threats will still be out of reach).
-Proven clearance of a wide variety of short and long range precision guided munitions: Super Hornet.
-Affordable within a $9B procurement budget and $7B 20 year maintenance budget? Unknown. If one needs 72 Super Hornets, (a more viable operational need), you might be looking in the $22B region with 300 flying hours per airframe per year. If you go with 65 jets and less annual flying hours, then you might be able to swing the $16B number for 20 years. And, there are actual existing figures to look at with the Super so Canadian decision makers have realistic information in front of them.
There is more to this list. But it is my opinion that the "theoretical" label applies to every F-35 metric. The F-35 does not have the maturity to be properly evaluated. It is possible that it may never reach that milestone.
What is not "theoretical" is how long one can keep CF-18s operationally viable. 2020 is the realistic limit. If a procurement decision is made within the next year, it may be possible for Canada to retire the CF-18 with dignity while maintaining operational capability for home defense and operations abroad.
Boeing Super Hornet flipbook (PDF)
Labels:
Canada,
DND,
F-35,
Super Hornet,
theory
DND depended on the "fifth-generation fighter" meme to sole source F-35
The F-35 part of the Canadian Auditor General's report is here. If you follow fighter tech, a read of the report will show many holes in DND assumptions.
For instance, in 2008, DND wanted to sole-source the F-35. In order to do so they needed something that set it apart from other fighter aircraft. That something was the "fifth-generation fighter" meme.
Here is how the AG report defined a "fifth-generation" fighter:
Emphasis added. "According to manufacturers".
While the report shows that DND supposedly researched other available fighter aircraft, there is no evidence that DND has received the classified U.S. Navy Super Hornet briefing (approved by the U.S. State Department) which is a precursor to any consideration of that aircraft.
As an aside: Boeing has delivered Super Hornets to the U.S. Navy and Australia, on-time and on-budget. The same also applies to Korea's order of F-15K's.
It is my opinion that one of the steps that has to be taken to fix this mess is to fire some people; pour encourager les autres.
--
Canadian AG report states DND misled Parliament over the F-35
For instance, in 2008, DND wanted to sole-source the F-35. In order to do so they needed something that set it apart from other fighter aircraft. That something was the "fifth-generation fighter" meme.
Here is how the AG report defined a "fifth-generation" fighter:
Fifth generation capability—Fighter jets that, according to manufacturers, incorporate the most modern technologies, such as stealth, advanced radar, and integrated avionics. There is no accepted or objective definition of fifth generation capability.
Emphasis added. "According to manufacturers".
While the report shows that DND supposedly researched other available fighter aircraft, there is no evidence that DND has received the classified U.S. Navy Super Hornet briefing (approved by the U.S. State Department) which is a precursor to any consideration of that aircraft.
As an aside: Boeing has delivered Super Hornets to the U.S. Navy and Australia, on-time and on-budget. The same also applies to Korea's order of F-15K's.
It is my opinion that one of the steps that has to be taken to fix this mess is to fire some people; pour encourager les autres.
--
*UPDATE* AG- DND misled Parliament over the F-35
Canadian AG report states DND misled Parliament over the F-35
Still no time left for Canada
DND costing figures on the F-35 are wrong
Exploring another option for Canada's CF-18 replacement
A CF-18 replacement scenario for Canada
Wednesday, April 4, 2012
*UPDATE* AG- DND misled Parliament over the F-35
The Canadian Auditor General has released a damning report on the government's 2010 decision to select the F-35 as the CF-18 replacement.
What appears to have happened is that before the July 2010 F-35 announcement by the current government, there was a DND estimate that the F-35 program would cost $25B (including 20 years of maintenance) if Canada went through with it.
After the government announced the decision for the F-35, the $16B figure was claimed by the DND (and even published on their website). In 2011, the DND stated $14.7B in response to a report done by the Parliamentary Budget Officer, Kevin Page.
The report by Page was much higher than any DND estimate and was attacked by the F-35 fan-base. As it turns out--given the huge cost rise in the F-35 program--Page is probably closer on the numbers. The AG agrees.
The current government's defense is,"we haven't signed a contract yet!". True. It is the untruthful language leading up to that decision that is the problem.
Parliament will likely respond to this fraud by pulling DND's authority to procure a CF-18 replacement. A good move because DND has proven they can't be trusted with what could be the most expensive Canadian military procurement in history. DND (and the current government) went native to Lockheed Martin fairy tales. What happens to the careers of people involved in this lie to parliament is yet to be seen.
*** UPDATE- Alan Williams has some good comments in this CBC video.
--
What appears to have happened is that before the July 2010 F-35 announcement by the current government, there was a DND estimate that the F-35 program would cost $25B (including 20 years of maintenance) if Canada went through with it.
After the government announced the decision for the F-35, the $16B figure was claimed by the DND (and even published on their website). In 2011, the DND stated $14.7B in response to a report done by the Parliamentary Budget Officer, Kevin Page.
The report by Page was much higher than any DND estimate and was attacked by the F-35 fan-base. As it turns out--given the huge cost rise in the F-35 program--Page is probably closer on the numbers. The AG agrees.
The current government's defense is,"we haven't signed a contract yet!". True. It is the untruthful language leading up to that decision that is the problem.
Parliament will likely respond to this fraud by pulling DND's authority to procure a CF-18 replacement. A good move because DND has proven they can't be trusted with what could be the most expensive Canadian military procurement in history. DND (and the current government) went native to Lockheed Martin fairy tales. What happens to the careers of people involved in this lie to parliament is yet to be seen.
*** UPDATE- Alan Williams has some good comments in this CBC video.
--
Canadian AG report states DND misled Parliament over the F-35
Still no time left for Canada
DND costing figures on the F-35 are wrong
Exploring another option for Canada's CF-18 replacement
A CF-18 replacement scenario for Canada
Labels:
AG,
Canada,
DND,
F-35,
misleading,
report,
spin and sophistry
Sunday, April 1, 2012
New Fed Budget: Canada seeks "affordable" CF-18 replacement
The new Canadian federal budget has been released.
This article led me there.
I expected to find more mentions about Defence and the CF-18 replacement than what the reporter found. But I did not.
It says in the budget, that Canada seeks an "affordable" CF-18 replacement.
If the DND was confused before, they have no reason to be now. What ever replaces the CF-18 has to be affordable.
Sometime before 2020 would be nice.
This article led me there.
I expected to find more mentions about Defence and the CF-18 replacement than what the reporter found. But I did not.
It says in the budget, that Canada seeks an "affordable" CF-18 replacement.
Updating Defence Capital Funding (page 223)
The Government of Canada has made significant progress towards the implementation of the Canada First Defence Strategy, which outlines a comprehensive, long-term plan to provide the Canadian Forces with the people, equipment and support they need to carry out their core missions in Canada and elsewhere in North America and abroad.
The Government will continue to replace key equipment, including purchasing new ships built in Canada through the National Shipbuilding Procurement Strategy, as well as by acquiring an affordable replacement for Canada’s aging CF-18 fleet to better equip Canada’s men and women in uniform. In order to ensure that funding for major capital equipment procurements is available when it is needed, the Government is adjusting the National Defence funding profileto move $3.54 billion over seven years into the future period in which purchases will be made.
If the DND was confused before, they have no reason to be now. What ever replaces the CF-18 has to be affordable.
Sometime before 2020 would be nice.
Saturday, March 17, 2012
2010 DND F-35 brief used to sell program to decision makers lacks credibility
From today's news:
With a few minutes of searching, I have found the infamous brief used by the DND in 2010. It is below.
The briefing from 2010 has a problem. Little of it is accurate. It assumes much. It contains rehashed Lockheed Martin briefing graphics. Not much in the way of any true analysis there.
Not mentioned in the slide is the aircraft's lack of survivability potential. Or, that in the Pacific Rim, the F-22 will be the reference threat that the F-35 will have to survive against in order to be of any use against future threats in the next 5 years and beyond.
One slide that points to "mandatory" requirements is of interest. With all the technical problems, delay and cost rise, the F-35 program is currently at severe risk of meeting none of the requirements.
Another slide on costs is woefully unrealistic. It claims aircraft cost is "low 70USD". Good luck with that, even from a 2010 perspective. One part of this slide is very accurate. It says, "No new money". So true. The acquisition side of the CF-18 has to come in at a ceiling of $9B.
Finally, the beginning of the brief spends a lot of time on Joint Strike Fighter program history. I wonder how Canadians would feel if they knew that the X-35 concept demonstrator had no weapons bays? With that, Lockheed Martin had less weight challenges to "win" the Joint Strike Fighter contract in 2001.
The brief qualifies as fraud by trick or device. Maybe Parliament can reach an awareness of this sham.
"OTTAWA — Defence Department officials glossed over warnings that the F-35 project was facing serious scheduling and cost problems as they pitched the stealth fighter to the government in 2010, newly released documents indicate.
Rather, while Lockheed Martin was admitting the program was thousands of hours behind schedule and missing numerous benchmarks, the Canadian military was giving slick presentations highlighting the aircraft's stealth capabilities."
With a few minutes of searching, I have found the infamous brief used by the DND in 2010. It is below.
The briefing from 2010 has a problem. Little of it is accurate. It assumes much. It contains rehashed Lockheed Martin briefing graphics. Not much in the way of any true analysis there.
Not mentioned in the slide is the aircraft's lack of survivability potential. Or, that in the Pacific Rim, the F-22 will be the reference threat that the F-35 will have to survive against in order to be of any use against future threats in the next 5 years and beyond.
One slide that points to "mandatory" requirements is of interest. With all the technical problems, delay and cost rise, the F-35 program is currently at severe risk of meeting none of the requirements.
Another slide on costs is woefully unrealistic. It claims aircraft cost is "low 70USD". Good luck with that, even from a 2010 perspective. One part of this slide is very accurate. It says, "No new money". So true. The acquisition side of the CF-18 has to come in at a ceiling of $9B.
Finally, the beginning of the brief spends a lot of time on Joint Strike Fighter program history. I wonder how Canadians would feel if they knew that the X-35 concept demonstrator had no weapons bays? With that, Lockheed Martin had less weight challenges to "win" the Joint Strike Fighter contract in 2001.
The brief qualifies as fraud by trick or device. Maybe Parliament can reach an awareness of this sham.
Canadian F-35 purchase slips to 2017-2023 time-frame
Canadian AG report states DND misled Parliament over the F-35
Still no time left for Canada
DND costing figures on the F-35 are wrong
Exploring another option for Canada's CF-18 replacement
A CF-18 replacement scenario for Canada
Canadian F-35 purchase slips to 2017-2023 time-frame
Canada will most certainly delay their F-35 procurement. The reason? Cost.
According to their associate defence minister Fantino, the total procurement must not exceed the $9B plan.
Back in 2010, Canada stated they would purchase their jets during the 2016 time-frame as this would be "peak-production" and thus best value.
Economies of scale and all that.
Today, Canada has stated that the 2017-2023 years could be the time of best purchase value.
This means that there is a good chance the existing CF-18s will be on severe flight restriction to make it that far. Then again, Canada has a pilot shortage and the ones that are around only get about 180 hours per year.
It seems over-all, the fighter business is just too expensive for Canada if they stick to the current path.
Next month, the Auditor General will release a report stating that the DND mislead Parliament over the F-35 decision. Not a hard leap to make given other procurement decisions.
DND claims the F-35 is the only aircraft to meet the requirement as a CF-18 replacement.
Not a surprise when you select the aircraft based on Lockheed Martin talking points and write up the defence requirement after-the-fact.
Maybe, by 2020, an intelligent purchaser of aircraft will have a thoroughly tested, go-to-war example of an F-35 to contemplate.
Maybe.
By then, it will have been obsolete to the high-end threats for at least 5 years. IOC: 7 years. FOC: 10 years.
For any other mission; existing technology does it better; cheaper.
Maybe by 2020, Canada will have something much more valuable: a reformed defence procurement policy.
According to their associate defence minister Fantino, the total procurement must not exceed the $9B plan.
Back in 2010, Canada stated they would purchase their jets during the 2016 time-frame as this would be "peak-production" and thus best value.
Economies of scale and all that.
Today, Canada has stated that the 2017-2023 years could be the time of best purchase value.
This means that there is a good chance the existing CF-18s will be on severe flight restriction to make it that far. Then again, Canada has a pilot shortage and the ones that are around only get about 180 hours per year.
It seems over-all, the fighter business is just too expensive for Canada if they stick to the current path.
Next month, the Auditor General will release a report stating that the DND mislead Parliament over the F-35 decision. Not a hard leap to make given other procurement decisions.
DND claims the F-35 is the only aircraft to meet the requirement as a CF-18 replacement.
Not a surprise when you select the aircraft based on Lockheed Martin talking points and write up the defence requirement after-the-fact.
Maybe, by 2020, an intelligent purchaser of aircraft will have a thoroughly tested, go-to-war example of an F-35 to contemplate.
Maybe.
By then, it will have been obsolete to the high-end threats for at least 5 years. IOC: 7 years. FOC: 10 years.
For any other mission; existing technology does it better; cheaper.
Maybe by 2020, Canada will have something much more valuable: a reformed defence procurement policy.
Canadian AG report states DND misled Parliament over the F-35
Still no time left for Canada
DND costing figures on the F-35 are wrong
Exploring another option for Canada's CF-18 replacement
A CF-18 replacement scenario for Canada
Saturday, March 3, 2012
DND costing figures on the F-35 are wrong
This is an update to a previous post about how the Canadian DND numbers and flawed theory in relation to an attempt to acquire the F-35 are not credible. I have created a new chart that is a better apples-to-apples comparison of the DND figures for 20 years of aircraft maintenance.
It is unfortunate that it had to come to this. No matter what F-35 partner nation it is (along with the U.S.) Lockheed Martin talking points are often substituted for real analysis. There are a few exceptions but not many.
It is unfortunate that it had to come to this. No matter what F-35 partner nation it is (along with the U.S.) Lockheed Martin talking points are often substituted for real analysis. There are a few exceptions but not many.
(click image to make larger)
Friday, March 2, 2012
Canada can't afford 65 F-35s
The Canadian DND is still in trouble with their F-35 cost figures.
I have provided some assumptions below that indicate Canada can never afford 65 F-35s. The government has already stated they want to keep within the $16B budget. So, with that, how many F-35s can they afford?
One of the key assumptions is that the aircraft becomes a combat capable system. With all the troubles, we don't know.
It is foolish to buy anything before a low-rate-initial production batch 9 aircraft. If there are no other technical show stoppers (unlikely given the history of the program), a concerned buyer wants the final Block 3f software and all the bugs and major technical problems worked out. LRIP-9 is about as early a buy as you want to go.
If Canada doesn't fly the jet much, they might be able to park all 65. They won't have a combat capability of worth though.
The flying hours I have shown below are scary. 180 hours a year per airframe only gets you one pilot per jet with minimum qualifications and recurrent training. This is not a reasonable combat deterrent unless all your air wars are 1 sortie per F-35.
The chart does not show extra things like facilities and some other needed accessories. For example: those AIM-120D AMRAAM air-to-air missiles at $2.5M each.
The DND still has a lot more work to do in order to prove this massive military acquisition to the taxpayer.
I have provided some assumptions below that indicate Canada can never afford 65 F-35s. The government has already stated they want to keep within the $16B budget. So, with that, how many F-35s can they afford?
One of the key assumptions is that the aircraft becomes a combat capable system. With all the troubles, we don't know.
It is foolish to buy anything before a low-rate-initial production batch 9 aircraft. If there are no other technical show stoppers (unlikely given the history of the program), a concerned buyer wants the final Block 3f software and all the bugs and major technical problems worked out. LRIP-9 is about as early a buy as you want to go.
If Canada doesn't fly the jet much, they might be able to park all 65. They won't have a combat capability of worth though.
The flying hours I have shown below are scary. 180 hours a year per airframe only gets you one pilot per jet with minimum qualifications and recurrent training. This is not a reasonable combat deterrent unless all your air wars are 1 sortie per F-35.
The chart does not show extra things like facilities and some other needed accessories. For example: those AIM-120D AMRAAM air-to-air missiles at $2.5M each.
The DND still has a lot more work to do in order to prove this massive military acquisition to the taxpayer.
(click image to make larger)
Labels:
Canada,
DND,
F-35,
sustainment
Monday, February 20, 2012
CF-18 refurb a poor idea
The idea that CF-18s would run out of life by 2020 wasn't much news to us that actually take the time to study the issue.
Funny how the issue is just now appearing in the media.
Slow.
As I have mentioned before, the F-35 is disqualified as a CF-18 replacement for any number of reasons but also, time.
It will be the 2020s before any intelligent purchaser of military equipment can evaluate the F-35 for their air arm. That is, if the program lasts that long.
There is also significant confusion on refurbishment (or what defines refurbishment) for a CF-18.
The CF-18 and the F-16 were designed as part of a light-weight fighter design. The goal was to build up affordable fighter aircraft in-number to face the Soviet threat.
The CF-18 and F-16 are not "depot-jets" like the F-15. In other words, the F-15 was designed to fly x amount of hours and then go into deep maintenance every 5-7 years, then put back into the field. I have seen the F-15 depot process first hand.
The CF-18 and F-16 were meant to be flown x amount of hours and then thrown into the trash. Of the two, the F-16 is easier to extend life on. Wing flex, forward bulkhead corrosion and various fittings have to be replaced.
The CF-18 (or all classic Hornets) require many things in refurbishment. There is the center-barrel replacement. This is the area of the fuselage where the wings and landing-gear are located. This part of the jet is disassembled and then you look to see how bad things are. Each barrel replacement is a custom job as each jet has different levels of corrosion and wear.
Barrel replacement started out as a one-off fluke. Years ago a new F-18C was wrecked. Someone decided if they changed the barrel and some other things, they could put the aircraft back into action.
Today that process has turned into a small production line. Depending on who does it (places like Jacksonville, Florida) or up in Canada, it can take up to a year to perform.
And this doesn't count for all the other areas that need to be refurbished that don't include the barrel; wing corrosion fixes being one.
And as one can see in this 2007 Australian example: ministers and politicians can get a might confused over the process.
Well, there you go.
Refurbishing CF-18s (again) to make them last past 2020 is a fool's errand. But try telling these people such a thing.
Sorry, I am not seeing him as a "defence expert" on this topic. Think flight envelope restriction (by airframe) and an operational scheduling mess (only airframes xs to xy can carry this amount of weight or push x amount of g's).
End the stupidity.
The only solution is for Canada to stop and begin a tender process for the CF-18 replacement.
Any other solution is irresponsible.
Funny how the issue is just now appearing in the media.
Slow.
As I have mentioned before, the F-35 is disqualified as a CF-18 replacement for any number of reasons but also, time.
It will be the 2020s before any intelligent purchaser of military equipment can evaluate the F-35 for their air arm. That is, if the program lasts that long.
There is also significant confusion on refurbishment (or what defines refurbishment) for a CF-18.
The CF-18 and the F-16 were designed as part of a light-weight fighter design. The goal was to build up affordable fighter aircraft in-number to face the Soviet threat.
The CF-18 and F-16 are not "depot-jets" like the F-15. In other words, the F-15 was designed to fly x amount of hours and then go into deep maintenance every 5-7 years, then put back into the field. I have seen the F-15 depot process first hand.
The CF-18 and F-16 were meant to be flown x amount of hours and then thrown into the trash. Of the two, the F-16 is easier to extend life on. Wing flex, forward bulkhead corrosion and various fittings have to be replaced.
The CF-18 (or all classic Hornets) require many things in refurbishment. There is the center-barrel replacement. This is the area of the fuselage where the wings and landing-gear are located. This part of the jet is disassembled and then you look to see how bad things are. Each barrel replacement is a custom job as each jet has different levels of corrosion and wear.
Barrel replacement started out as a one-off fluke. Years ago a new F-18C was wrecked. Someone decided if they changed the barrel and some other things, they could put the aircraft back into action.
Today that process has turned into a small production line. Depending on who does it (places like Jacksonville, Florida) or up in Canada, it can take up to a year to perform.
And this doesn't count for all the other areas that need to be refurbished that don't include the barrel; wing corrosion fixes being one.
And as one can see in this 2007 Australian example: ministers and politicians can get a might confused over the process.
"Dr Nelson said modified aircraft would regain 100 per cent of their fatigue life, giving up to nine years' additional service life."
Well, there you go.
Refurbishing CF-18s (again) to make them last past 2020 is a fool's errand. But try telling these people such a thing.
"Defence experts have been pushing the government since last fall to consider a further upgrade to the CF-18s.
Retired air force lieutenant-colonel Dean Black has said it's something that should be considered rather than going down the road of Australia buying new Super Hornets, the beefed up version of the F-18."
Sorry, I am not seeing him as a "defence expert" on this topic. Think flight envelope restriction (by airframe) and an operational scheduling mess (only airframes xs to xy can carry this amount of weight or push x amount of g's).
End the stupidity.
The only solution is for Canada to stop and begin a tender process for the CF-18 replacement.
Any other solution is irresponsible.
Labels:
CF-18,
defect-by-design,
DND,
F-35
Sunday, February 19, 2012
DND boss expressed worries to U.S. Senate Armed Services Committee chair
It is tough to be DND minister Mackay. Some people are so arrogant they will do anything not to be proven wrong.
See this Canadian article (Google translate: French-to-English).
MacKay has openly pleaded with U.S. Senator McCain claiming that the F-35 is the only solution for Canada. It is unfortunate that all this time, MacKay has been so poorly advised by his staff.
Or, they can come up with a credible plan-B. I wonder if MacKay has read this letter?
See this Canadian article (Google translate: French-to-English).
MacKay has openly pleaded with U.S. Senator McCain claiming that the F-35 is the only solution for Canada. It is unfortunate that all this time, MacKay has been so poorly advised by his staff.
Ottawa- Fearing political fallout from the release of Republican Senator John McCain against cost overruns associated with construction of the F-35, Defence Minister Peter MacKay called the American politician, last June, to sing the praises of this device that wish to buy Canada, the United States and other allies.Another problem is Canada has to stick to a rigid budget based on erroneous assumptions like this:
The call from the Minister MacKay occurred about two weeks after striking the statements of Senator McCain before the committee of the Senate Armed Services to study the viability of the purchase of these stealth aircraft to be built by U.S. firm Lockheed Martin.
Mr. McCain has specifically stated that the Pentagon should abandon the acquisition program of approximately 2400 units given the explosion of construction costs and failures in the development of these devices.
In Canada, the Harper government maintains that it will pay on average $ 75 million per aircraft. It then plans to spend $ 7 billion for aircraft maintenance for two decades. But many believe that the unit cost will be much higher - from 110 to 135 million.Based on current USAF costing issues, Canada will be luck to afford 20 jets. And what they buy will be riddled with mistakes.
Or, they can come up with a credible plan-B. I wonder if MacKay has read this letter?
Labels:
Canada,
defect-by-design,
DND,
F-35
Saturday, February 11, 2012
A CF-18 replacement scenario for Canada
My last off the cuff figure of what it would take for Canada to do a Super Hornet deal was stripped and not equipped. As someone suggested, it would be in the end, too low.
What would a real deal look like? Probably something like below. Interesting. Because it isn't too far off from the non-DND studies thrown about for an F-35 procurement (much higher than the Lockheed Martin talking point crowd). My scenario has support for 20 years and not 30 years. More; note the language that I used in the fake DSCA release below. It hints at an open competition for replacement of Canada's aging CF-18s.
I propose that the second order of Super Hornets would be for 36 single-seat E models. A package very similar to above in content for $6.3B. Grand-total: 72 aircraft.
Operating and sustainment figures for 20 years will be for cost of flight hour only. I am averaging this out to $22k per flight hour; 300 flight hours per airframe, per year.
Grand total (not counting facilities upgrades) is around $22.3B to replace Canada's CF-18s with 72 Super Hornets including 20 years of basic operations and sustainment costs.
What would a real deal look like? Probably something like below. Interesting. Because it isn't too far off from the non-DND studies thrown about for an F-35 procurement (much higher than the Lockheed Martin talking point crowd). My scenario has support for 20 years and not 30 years. More; note the language that I used in the fake DSCA release below. It hints at an open competition for replacement of Canada's aging CF-18s.
Canada – F/A-18E/F Super Hornet Aircraft
WASHINGTON, August 8, 2013 – Today the Defense Security Cooperation Agency (DSCA) notified Congress of a possible Foreign Military Sale to the Government of Canada of 28 F/A-18E Super Hornet Aircraft, eight F/A-18F Super Hornet Aircraft, 72 F414-GE-400 installed engines, a host of spare parts and munitions at an estimated value of $6.5 billion; with an option to purchase at a later date an additional 36 aircraft.
The Government of Canada has requested proposals from several foreign suppliers, including the United States, to provide the next generation fighter for the Canadian Defence Force. In this competition, the Government of Canada has yet to select the United States Navy-Boeing proposal.
This notification is being made in advance of receipt of a letter of request so that, in the event that the US Navy-Boeing proposal is selected, the United States might move as quickly as possible to implement the sale. If the Government of Canada selects the U.S. Navy-Boeing proposal, the Government of Canada will request a possible sale of 28 F/A-18E Super Hornet Aircraft, eight F/A-18F Super Hornet Aircraft, 72 F414-GE-400 installed engines, four F414-GE-400 spare engines, 36 AN/APG-79 Radar Systems, 36 M61A2 20mm Gun Systems, 36 AN/ALR-67(V) three Radar Warning Receivers, 144 LAU-127 Launchers, 44 Joint Helmet Mounted Cueing Systems (JHMCS), 144 AIM-120D Advanced Medium Range Air-to-Air Missiles (AMRAAM), 144 AIM-9X SIDEWINDER Missiles, and 36 AN/ASQ-228 (V2) Advanced Targeting Forward-Looking Infrared (ATFLIR) Pods. Also included are 36 AN/ALQ-214 Radio Frequency Countermeasures. 40 AN/ALE-47 Electronic Warfare Countermeasures Systems, 112 AN/ALE-55 Towed Decoys, 12 air-to-air refueling kits, Joint Mission Planning System, support equipment, spare and repair parts, personnel training and training equipment, ferry and tanker support, flight test, software support, publications and technical documents, U.S. Government and contractor engineering, technical and logistics support services, and other related elements of logistics and program support.
I propose that the second order of Super Hornets would be for 36 single-seat E models. A package very similar to above in content for $6.3B. Grand-total: 72 aircraft.
Operating and sustainment figures for 20 years will be for cost of flight hour only. I am averaging this out to $22k per flight hour; 300 flight hours per airframe, per year.
Grand total (not counting facilities upgrades) is around $22.3B to replace Canada's CF-18s with 72 Super Hornets including 20 years of basic operations and sustainment costs.
(ATFLIR on BlockII F-18F)
Labels:
Canada,
DND,
F-35,
scenario,
Super Hornet
Wednesday, November 23, 2011
Another potential CF-18 replacement totally ignored by the DND
There is another valid contender out there that the Canadian DND is totally ignoring for its CF-18 replacement.
That aircraft is the French Rafale.
Consider some of the features of the Rafale.
1.Buddy-refuel tanking like a Super Hornet
2.Excellent maneuverability
3.Two-engines
4.Two-seat option
5.Joint with NATO coalition forces (networking) and combat ops.
To add to that, as the current government LOVES to bring up the most dangerous opponent NATO could ever face--Libya--the Rafale is proven in that combat op.
It has some downsides. Because the path to the Meteor long-range air-to-air missile and AESA are not complete, the Rafale might disqualify itself for not being ready at this moment. This is critical because if any real thinking person is involved in the process, CF-18s should be fully replaced by 2020.
Since no other country has bought a Rafale, Canada wouldn't have hard, realistic info on what the jet costs to procure and sustain.
In any event, the Rafale makes a much safer play than the high-risk F-35.
Which goes back to the fact that Canada should have a real competition for its CF-18 replacement.
The idea that nothing else but the F-35 can meet "DND's requirements", is the act of a person that is gullible or a person intent on defrauding the taxpayer.
That aircraft is the French Rafale.
Consider some of the features of the Rafale.
1.Buddy-refuel tanking like a Super Hornet
2.Excellent maneuverability
3.Two-engines
4.Two-seat option
5.Joint with NATO coalition forces (networking) and combat ops.
To add to that, as the current government LOVES to bring up the most dangerous opponent NATO could ever face--Libya--the Rafale is proven in that combat op.
It has some downsides. Because the path to the Meteor long-range air-to-air missile and AESA are not complete, the Rafale might disqualify itself for not being ready at this moment. This is critical because if any real thinking person is involved in the process, CF-18s should be fully replaced by 2020.
Since no other country has bought a Rafale, Canada wouldn't have hard, realistic info on what the jet costs to procure and sustain.
In any event, the Rafale makes a much safer play than the high-risk F-35.
Which goes back to the fact that Canada should have a real competition for its CF-18 replacement.
The idea that nothing else but the F-35 can meet "DND's requirements", is the act of a person that is gullible or a person intent on defrauding the taxpayer.
Sunday, October 30, 2011
DND force structure needs help and faulty subs are not useful
The Canadian military force structure needs a lot of help in all areas of interest.
There is some interesting items out there in reference to Canada and submarines including Canada and U.S. nuclear submarines.
Given all of the other communities in the DND that are in need of cash and actually provide value to Canadian security interests, I can only see the sub issue as a complete waste of money.
Canada has gone some years now without a sub force. I qualify a sub force as something that is reliable; and has real combat capability. The current collection of worthless submarines in Canada's possession have never qualified as a sub force.
Get rid of the program.
As Fredrick the Great once said, "He who defends everything, defends nothing".
Canada needs search and rescue aircraft. It needs transport aircraft. It needs patrol ships and small frigates. It needs a reasonable Army.
And these communities don't have to only exist. They have to be well trained and sustained to be a reliable resource.
Canada also needs fighter aircraft. However they have to be affordable and useful. Since Canada has not requested the F-22, any other solution it decides on will not be able to stand up to high-end threats.
OK. Fine.
The requirement for fighter aircraft should be something that is affordable; can meet home air patrol needs and can jointly take part in allied air campaigns that no matter what, will need the U.S. to clear the big threats with other resources Canada does not have.
The F-35 does not meet any of these requirements. Simply because there is no finished go-to-war example for an intelligent purchaser of military equipment to evaluate.
Canada would be better off by creating a DND leadership that can provide real security solutions for the civilian leaders. Without that, I am afraid the results can only be more muddle.
There is some interesting items out there in reference to Canada and submarines including Canada and U.S. nuclear submarines.
Given all of the other communities in the DND that are in need of cash and actually provide value to Canadian security interests, I can only see the sub issue as a complete waste of money.
Canada has gone some years now without a sub force. I qualify a sub force as something that is reliable; and has real combat capability. The current collection of worthless submarines in Canada's possession have never qualified as a sub force.
Get rid of the program.
As Fredrick the Great once said, "He who defends everything, defends nothing".
Canada needs search and rescue aircraft. It needs transport aircraft. It needs patrol ships and small frigates. It needs a reasonable Army.
And these communities don't have to only exist. They have to be well trained and sustained to be a reliable resource.
Canada also needs fighter aircraft. However they have to be affordable and useful. Since Canada has not requested the F-22, any other solution it decides on will not be able to stand up to high-end threats.
OK. Fine.
The requirement for fighter aircraft should be something that is affordable; can meet home air patrol needs and can jointly take part in allied air campaigns that no matter what, will need the U.S. to clear the big threats with other resources Canada does not have.
The F-35 does not meet any of these requirements. Simply because there is no finished go-to-war example for an intelligent purchaser of military equipment to evaluate.
Canada would be better off by creating a DND leadership that can provide real security solutions for the civilian leaders. Without that, I am afraid the results can only be more muddle.
Subscribe to:
Posts (Atom)
