Showing posts with label senate. Show all posts
Showing posts with label senate. Show all posts

Friday, August 31, 2012

Senate report on Defence procurement learning disability can be read here

The Senate report mentioned previously in reference to the inability of the entrenched defence bureaucracy to get procurement right (or even learn from their mistakes) is at the bottom of this post in PDF format.

There are several things in it. Too much to cover here in one post.

I took a look at the Air Warfare Destroyer issues. The project claims to be within budget limits, just delayed. Don't know how you achieve that one.

The AWD idea was briefed to the government for (pdf) $6B years ago, then sold to the government for $8B and it could see $10B.

For 3 ships.

Here is an interesting quote from the report:


(click image to make larger)

These are the same kind of people that we will depend on to get the Collins submarine replacement right.



Thursday, June 7, 2012

What the U.S. Senate was told about more F-35 trouble

The RAAF force structure cancer is a problem created by the Entrenched Defence Bureaucracy.

Gross over-optimism and hope will not fix that problem.

This read is what was told to the U.S. Senate recently. Unaffordable, unsupportable, unable to face emerging threats. That is the F-35.

And, the RAAF even wants another try at the bad idea of extending the airframe life on legacy Hornets. Here is the problem faced by the U.S. Navy.

The Navy intends that a SLEP would extend the life of select legacy F/A–18s from 8,600 to 10,000 flight hours. As yet, the Navy does not have sufficient data to predict the failure rate for aircraft being inducted into the SLEP program. Too high a failure rate could leave the Navy with too few aircraft that could benefit from the SLEP program, which would exacerbate the shortfall projections.