Showing posts with label maintenance. Show all posts
Showing posts with label maintenance. Show all posts

Friday, May 4, 2012

Australia's real air capability plan

LOL. Too bad the Hornet was never made as a PDM jet like F-15s, F-111s and B-52s.

Wonder what they will do when the F-35 falls on its face?
Minister for Defence Materiel – Release of Tender – Deeper maintenance for the RAAF Classic Hornet fleet
4 May 2012
Minister for Defence Materiel Jason Clare announced the release of a Request for Tender (RFT) for the deeper maintenance of the F/A-18 Classic Hornet fleet.

“The F/A-18 Hornet is a very capable multi-role fighter which can undertake a wide range of air-to-air and air-to-ground missions including air combat, close air support of ground troops, and interdiction of enemy supply lines,” Mr Clare said.

“This contract will provide all deeper maintenance requirements for the 55 single-seat and 16 dual-seat aircraft and associated systems.

“This includes operational fight trainers, computer‑based training systems, maintenance training systems and Classic Hornet unique ground support and test equipment.”

The RFT closes in July 2012 with the new contract expected to take effect from April 2013.

Media contact: Korena Flanagan – 0418 251 316

Imagine if someone suggested this back in the days of Air 6000? Or, back in the days of the original Australian commitment to the Just So Failed in 2002?

How much has the F-35 Just So Farcical cost the taxpayer?

$6.6B for the Super Hornet gap-filler

$3-4B in lost F-111 capability

$1B in obsolete Growler upgrades.

Probably another $1.8B (minimum) for the geriatric jets mentioned above. Today, rebarrel work on Hornets goes for around $25M each. That doesn't count things like corrosion and wear on other parts of the airframe. Double the $1.8B.

$3.6B.

Add that all up and the dumbassery of Defence senior leadership has just surpassed the cost of the first 72 jets in the F-35 recap plan developed by the jet-setting NACC.

What a disaster.

Just think of the many more billions it will take to clean up this mess.

Sunday, June 19, 2011

Can 3, fly 8-the dysfunctional MOD supply chain

The UK has to cannibalize 3 Typhoons in order to keep 8 flying in the moronic sideshow which is the Libya operation.

Some are quick to say cannibalization is common. It depends. If it is too common, you always end up spending more taxpayer money to support flying operations. It points to incompetent flag-level management. It points to incompetent senior civilian military management.

When you pull a part from an aircraft to put on another, that part is not zero hours like the kind of part you pull off the shelf. This messes up your maintenance process; cascades, and causes other problems.

When you cannibalize an aircraft, you contribute to blowing out your maintenance man hour costs and creating bad side-effects. The person(s) assigned to pulling a part off of a can bird to put on another takes more time than going to a properly stocked parts bin. Also, when you source from your parts bin what you get is something that is fresh (no matter if it is new or refurbished) and you can predict the number of hours that it can fly on the aircraft before replacement.

So, when you pull a part off of a can bird you use more maintenance man hours that any unit can ill-afford and you “repair” the operational aircraft with a part that is in effect “used” and you will have to replace that part again on the same jet on shorter time intervals.

There is another danger of an improperly funded parts bin at the unit level. Consumable parts that you cannot cannibalize are also in short supply. Aircraft that would otherwise be on the flight training schedule sit on the ground. With either category of part, this  produces lost flight training hours.

Canning should happen in some extreme cases like remote airfields in combat. It should not happen with expensive aircraft that belong to air arms that supposedly employ proper logistics and finance people.

In the procurement holiday that was the post Cold War 1990’s, the U.S. military did a huge amount of cannibalization. It cost so much money in the budget due to lost maintenance/logistics man hours, extra budget administration man hours, lost flight training hours and loss of experienced people that Congress took notice.

Loss of experienced people? You see, when you stress out the pilot and maintenance community this much—pilots want to fly, maintainers can only take so many 12 hour/7 day shifts—they leave the service. The taxpayer loses good tribal knowledge that you have to then replace in the training pipeline with a green person. All because someone couldn’t budget money for the parts bin.

This happens in phases. It gets addressed (kind of). Then it gradually creeps up again. In an MRAP-one-war-wonder useless dirt operation era where UAV’s powered by uprated snowmobile engines are “air power” stars, I wonder how big the cannibalization problem is in today’s DOD?

Friday, May 20, 2011

Great story about a Collins-class sub in an exercise that never happened




Navy News, a publication of the Australian Navy, has sunk its credibility.

According to The Australian, Navy News published a story about how great an Australian Collins class submarine did on an exercise with our allies.

"The free-play phase provided Ballarat and Parramatta with the chance to exercise their anti-submarine warfare capabilities against a Collins-class submarine recognised as the best diesel-electric boat in the world.

"During the live phase, Dechaineux stalked the Anzac-class frigates and the other seven warships in a tactical game of cat and mouse, while evading military aircraft such as Ballarat's embarked Seahawk from 816 Squadron."

The problem is, the Dechaineux was never there. It was broken; tied up to a dock in Singapore. It appears that the dysfunctional Collins-class submarine program is so lethal that it can perform its mission tied up to a dock. Many could be forgiven for thinking this is the main mission of the Collins-class; to be tied up to a dock.

"The Dechaineux remains stranded in Singapore, where personnel from the Australian Submarine Corporation and the Defence Materiel Organisation are trying to fix the problem."

But yeah, we need to double our pain and build 12 replacements at home; even if there isn't enough project management skill to do the job.