There will be no next-generation long-range bomber for the United States Air Force.
Let us look at what we already know:
The USAF has poor ability to set requirements, choose winners of bids and generally have an idea of what they are doing when procuring major weapons systems. They have a long track record of failure. CSAR, Tanker lease failure, Tanker rejection, Long-range bomber concept cancelled, C-27 fubar, light combat aircraft goof, F-35 and, I may have missed some.
USAF claims they can bring in the next-generation bomber but consider the following:
A new U.S. Government Accounting Office (GAO) report on the KC-46 tanker shows some interesting numbers. While it may succeed, consider that the USAF will spend over $50B to field: tankers. In comparison to a new long-range bomber design, these tankers are modest modifications of existing commercial aircraft at well above $200B each.
So how, in a difficult budget environment, is an institution that has severe trouble managing large military procurements, supposed to be believed that they can make this new long-range bomber fantasy work?
I don't believe it. And, until the USAF gets its act together, neither should you.