The F-35 program lost hundreds of jets in the program of record, not all that long after Lockheed Martin won the JSF contract. In the silly money games that are DOD acquisition and procurement. That along with the technical problems early on, pushed the cost of the program up.
There is some entertainment at the end of the article linked in the first paragraph above.
After almost a decade of struggles with cost and technology, the F-35 program hit a major milestone last month when the Marines reached Initial Operational Capability on the jet.
Speaking ahead of that announcement, Lt. Gen. Jon Davis, deputy commandant for Marine aviation, explained that one of his great concerns is keeping the F-35 production line firing at top speed.
"Right now, I can't imagine wanting to cut back on the buy, because right now I'm replacing a greater number of F-18s, Harriers and Prowlers," Davis said in a July 27 conference call. "Obviously I'll defer to the commandant and do what he says. He and I have not talked about reducing the number of F-35s, so I'd have to go back and talk to him about that."
Yeah, you go have that talk. But just know that a USMC F-18D, brings more combat capability to the close air support fight, than the F-35 ever will. Including the RC mission variant.
-DOT&E Report: The F-35 Is Not Ready for IOC and Won't Be Any Time Soon
-Time's Battleland - 5 Part series on F-35 procurement - 2013
-Summary of Air Power Australia F-35 points
-Bill Sweetman, Aviation Week and the F-35
-U.S. Government Accounting Office (GAO) F-35 reports
-F-35 JSF: Cold War Anachronism Without a Mission
-History of F-35 Production Cuts
-Looking at the three Japan contenders (maneuverability)
-How the Canadian DND misleads the public about the F-35
-Value of STOVL F-35B over-hyped
-Cuckoo in the nest--U.S. DOD DOT&E F-35 report is out
-6 Feb 2012 Letter from SASC to DOD boss Panetta questioning the decision to lift probation on the F-35B STOVL.
-USAFs F-35 procurement plan is not believable
-December 2011 Australia/Canada Brief
-F-35 Key Performance Perimeters (KPP) and Feb 2012 CRS report
-F-35 DOD Select Acquisition Report (SAR) FY2012
-Release of F-35 2012 test report card shows continued waste on a dud program
-Australian Defence answers serious F-35 project concerns with "so what?"
-Land of the Lost (production cut history update March 2013)
-Outgoing LM F-35 program boss admits to flawed weight assumptions (March 2013)
-A look at the F-35 program's astro-turfing
-F-35 and F-16 cost per flying hour
-Is this aircraft worth over $51B of USMC tac-air funding?
-Combat radius and altitude, A model
-F-35A, noise abatement and airfields and the USAF
-Deceptive marketing practice: F-35 blocks
-The concurrency fraud
-The dung beetle's "it's known" lie
-F-35's air-to-air ability limited
-F-35 Blocks--2006 and today
-The F-35B design is leaking fuel
-F-35 deliveries
-ADF's wacky F-35 assumptions
-Gauging performance, the 2008 F-35, Davis dream brief
-Aboriginal brought out as a prop
-Super Kendall's F-35 problem
-LM sales force in pre-Internet era
-History of F-35 engine problems
-Compare
-JSF hopes and dreams...early days of the Ponzi Scheme
-The Prognostics
-2002--Australia joins the F-35 program
-Congressional Research Service--Through to FY2013, F-35 has received $83.3B in funding
-F-35 choice gives Dutch a shocking high cost per flight hour
-More indications that the F-35 is a failed program
-From the year 2000. Very insightful. The JSF: One More Card In The House (PDF)
No comments:
Post a Comment