Sunday, April 15, 2012

2 more F-35s for LRIP-5

The DOD has ordered two more low-rate-initial-production (LRIP) batch 5, F-35 aircraft. One is an A, the other a C. The contract for their engines is still pending.

Here is what LRIP-5 looks like so far:


LRIP-5 DOD contract cost summary. $6595.4M and counting !

Date
Contract
Cost ($M) USD
10May10
Long-lead, eng (42)
138.8
6Jul10Long-lead (42)
522.5
9Dec11Airframes (30)
4012.0
27Dec11Engines
1122.0
27Dec11Non-recurring requirements
485.0
13Mar12Sustainment
56.3
13Apr12
Airframes (2)
258.8
?
Engines (2).....?
?
Total
6595.4




No comments: