Tanks and the ADF.
In the air and on land it’s a similar story, although rising unit costs have seen the numbers dwindle over time. Army’s 150 Centurion tanks were replaced by 101 Leopards and those in turn by 59 Abrams. Each generation was substantially more capable than the previous, but its role was the same.
That isn't true. Australia only has 27 or so M-1s. The rest were parked for lack of resources to keep the full buy going.
As pointed out before, the M-1 is a huge waste of resources.
27 poorly performing M-1 tanks vs. 101 Leopard 1s?
The ADF M-1 decision was a downgrade.
I will take a larger number of reliable Leopards that have good-enough capability.
How to improve the situation?
The ADF needs to disband its entire M-1 tank force. It provides no value.
If the ADF wants tanks, talk to the Canadians for advice.
There are some places in the Pacific Rim where you cannot use heavy tanks. There are some places where you can.
As for "medium" tanks, that is another story.
Read Ralph Zumbro.
.
-New Defence White Paper fails to address Australia's core security needs
-2009 Defence White Paper Fantasy
-Analysing "The ADF Air Combat Capability- On the Record"
-Find out who is responsible for the Air Warfare Destroyer mess
-Analysis of Defence Materiel Organisation Major Projects Management and What Needs to be Fixed
-New DMO Boss warns the staff that business as usual is over
-How dangerous is the Defence Material Organisation to our Defence Industry?
-Australia's Failing Defence Structure and Management Methodology
-More on the dud-jamming gear Defence wants to buy
-ADF cost per flying hour
-I will wipe out bullying vows new Defence chief (Houston 2005)
-Vacancy
-Put Vol 2 Report of DLA Piper Review into the light of day
-Rory and Jim
-Parasitism as an Abstraction for Organizational Dysfunctions
-Hobart-class "Air Warfare Destroyer" to be fielded with obsolete radar guidance technology
-The Decay Of Critical Military Thinking And Writing-With Particular Reference To The RAAF
-Newspaper guy gets it right about sub project.... big time
-The great M-1 tank myth
-*UPDATE* Fear and loathing in Canberra - Audit released on MRH-90 helicopter project
-RAN bullies contractor over Collins sub replacement
-2014-15 ADF budget shocker - Star-ranks
-Air Warfare Destroyer -- Billions, not millions over budget
-Australia's M-1 tanks are... a downgrade compared to what it had
-Weak links put on rubber-stamp Defence panel
-Stop the nonsense (Collins-class submarine replacement)
-Insert Joke Here
-Tyranny of distance--Long, drawn out helicopter projects are unsustainable
-2014-15 ADF budget shocker - cost per flying hour over the last budget year
-Tiger savaged by Navy League of Australia
-Tiger helicopter update
-Overview of corruption in Australia
-Government ignores its own 'rescue' report created to fix Air Warfare Destroyer woes
-DM Johnston fired in cabinet reshuffle
No comments:
Post a Comment